Beam Construction Formwork also called PP hollow formwork is made of modified PP powder with other additives by heating and extruding. It has high reuse times and water proof can replace troditional plywood. Eco friendly and easy to assemble. It is a style of building concrete structures with reusable plastic molds. This method requires almost no labor skills, gets the job done in record time, with minimal wastage in the process.
The Beam Construction Formwork has the commonality of traditional wood formwork, steel formwork and more features than conventional formwork. The hollow plastic building formwork has scientific structure, stronger strength, good toughness and strong bearing capacity; the thickness of the template can be selected according to the thickness of the wall and the bearing capacity. It can be reused more than 60 times, no water absorption, corrosion resistance, green environmental protection, and can effectively reduce engineering costs.
Beam Construction Formwork Specification |
||
Thickness(mm) | Length*Width(mm) | Weight(kg) |
15 | 915*1830 | 14-15 |
16 | 915*1830 | 15-16 |
17 | 915*1830 | 16-17 |
18 | 915*1830 | 17-18 |
15 | 1220*2440 | 24-25 |
16 | 1220*2440 | 26-27 |
17 | 1220*2440 | 27-28 |
18 | 1220*2440 | 29-30 |
All raw materials for each sheet are produced using new materials from Sinopec Corp., and do not contain any recycled raw materials.In -10℃-40℃ temperature weather, the expansion of the sheet is <1mm. |
PP Hollow Plastic Beam Construction Formwork provides the contractor with a rapid and cost effective method of constructing on site concrete ground beams and pile caps.
Manufactured from heavy duty polypropylene in 12mm -18mm thickness, Hollow Beam Construction Formwork offers many advantages over traditional formwork. Plastic Beam formwork is a new product to replace wood formwork, composite steel formwork, bamboo-wood bonding formwork and all-steel large formwork.
Plastic formwork VS Traditional formwork
Item | Hollow Plastic Formwork | PVC Formwork | Wooden Formwork | Aluminium Formwork |
Price(USD) | 12.53 | 11.24 | 5.25 | 119.94 |
Available times | 50 | 20 | 6 | 100 |
Drop test(10m) | No break | No break | break | Severe deformation |
Abrasion resistance | Excellent | Excellent | Bad | Excellent |
Deformation condition | No deformation | No deformation | Deformation | No deformation |
Stripping process | Easy | Easy | Difficult | Difficult |
Book nail | Easy | Difficult | Easy | No nails |
Dilatability and shrinkage | Very little | Variation with temperature | Little | Little |
Energy-saving | Recycled | Recycled | Large lumber consumption | Recycled |
Weight(kg/㎡) | 7 | 13 | 7.2 | 25 |
Scrap value(USD/㎡) | 4.20 | 2.70 | 0.15 | 29.99 |
Share cost(USD) | 0.17 | 0.42 | 0.84 | 0.90 |
Durable, easy to manage corrugated beam form for the construction of ground beams on site. Improve the speed, efficiency and quality of your foundation work by utilising pre-cut shuttering that can simply be dropped into trenches without issue.
Plastic Beam Construction Formwork Shuttering reduces the amount of soil to be removed, as well as the amount of concrete used. There’s no need to use chemicals such as mould oils, and you’re spending less time preparing your trenches and removing steel or ply shuttering.
It also requires minimal skill input from ground workers, significantly improving efficiency all-round.
Product Advantage: